Aikerly’s carbon fiber and titanium trekking pole feasibility study covers material selection, tube wall thickness, manufacturing and production planning.
NDA protected — your IP stays secure
Typical response within 2 business days
Carbon Fiber and Titanium
Trekking Pole Feasibility Study
1 Concept design
This concept study examines a three-section telescopic trekking pole for hiking and trekking. The proposed arrangement combines a carbon composite upper tube with two titanium alloy lower tubes, two external lever locks, an extended EVA grip and an adjustable wrist strap.
Carbon composite is considered for the largest tube to limit its mass while tailoring the laminate for bending stiffness. Titanium is considered for the lower sliding sections as a metal option to evaluate for local damage and behavior at the guides. The selection question is whether this combination offers enough value in use and manufacture to justify its weight and cost against an aluminum alternative.
The initial targets are approximately 61 cm packed length, 135 cm maximum extension and 260 g per pole. Aikerly would first agree the intended use, loading conditions, target cost and production quantity with the client, then translate these into a brief for the tube and component manufacturers.
Our preliminary recommendation is to proceed with tube-and-guide fit samples and collar trials. The nominal tubes can nest, but the lower guide allowance and carbon collar support need resolution before a complete prototype is built. Structural performance, finished weight and production repeatability remain subjects for validation.
Concept illustration. Materials, dimensions and performance remain subject to design verification.
2 Material selection
T800-class carbon fiber remains the upper-tube reference, with T700S as the first comparison material. T700S has a lower fiber tensile modulus than T800S, so each option needs a defined resin and laminate, followed by assessment of the finished tube. Fiber grade alone cannot establish bending performance or resistance to collar pressure. [1, 5]
TA18, nominally Ti-3Al-2.5V, remains the reference for the two metal tubes because this alloy family combines strength with cold formability. Grade 9 is the corresponding nominal ASTM alloy family; composition limits, product standard and delivery condition need separate verification. The choice between annealed and cold worked and stress relieved tubing affects the properties used in the design. [2, 6]
TC4, or Ti-6Al-4V, is retained for evaluation if the structural assessment identifies a need for its strength and the required thin-wall tubes can be manufactured consistently. A 7075 aluminum lower-tube option provides a separate weight and cost comparison; 7075 shafts are already used in commercial trekking poles. Each route needs its own section design and finished-part quotation. [3, 4]
For an OEM project, Aikerly would review material traceability, finished-tube properties, delivery condition and comparable quotations with the manufacturers. The next material decision would select a carbon laminate and metal tube condition for prototype drawings, using the agreed performance and cost requirements.
3 Tube dimensions and wall thickness
The preliminary tube sections are 16 x 0.6 mm for the carbon upper tube, 14 x 0.8 mm for the titanium middle tube and 12 x 0.8 mm for the titanium lower tube. These dimensions mean outside diameter x nominal wall thickness. They are trial dimensions for the study and remain open to revision.
The calculated bores are 14.8, 12.4 and 10.4 mm respectively. At the upper joint, a 14 mm middle tube inside a 14.8 mm bore leaves 0.8 mm diametral space, or 0.4 mm radial space. The lower joint leaves 0.4 mm diametral space, or 0.2 mm radial space, around the 12 mm tube. The joint drawing needs to allocate these spaces between the guides, surface finishes, manufacturing variation and running clearance.
The 0.6 mm carbon wall needs particular attention beneath the upper locking collar. Hoop reinforcement and suitable collar support should be assessed for local crushing and splitting. Any reinforcement added inside the tube reduces the bore available for the sliding section. Wall thickness, laminate and guide design therefore need to be developed together. [5]
Aikerly would coordinate the tube and lock drawings so that the finished bores, guide fit and collar support are assessed together. The structural review would then set minimum joint overlaps and check bending, axial compression, local denting and repeated loading at the intended working lengths. Extension marks would follow that assessment.
For preliminary mass budgeting, assumed densities of 1.60 g/cm3 for the carbon composite and 4.48 g/cm3 for titanium give bare tube masses of approximately 46.4, 148.6 and 126.1 g/m. The composite density is a calculation assumption; the titanium value is a published typical property. [2] If all three tubes were 500 mm long, their combined bare mass would be about 160.6 g, leaving 99.4 g within a 260 g target for locks, guides, local reinforcement, grip, strap, tip and finishes. These example cut lengths have not been shown to achieve both length targets.
4 Manufacturing processes
Roll wrapping prepreg on a mandrel is the initial process to evaluate for the carbon tube. Axial plies can provide bending stiffness, with angled and hoop plies positioned for torsion and collar loads. The proposed sequence is layup, consolidation, curing, mandrel removal, trimming and finishing. The selected resin and laminate would determine the curing process. [5]
The mandrel and curing process would control the carbon bore, while the layup and finishing allowance would control the outside diameter. Finishing must preserve the structural plies. For titanium, seamless cold-drawn or cold-rolled tubing is the proposed route, with the delivery condition and heat treatment agreed before straightening, cutting, deburring and finishing. Final inspection would cover the bores, wall variation, ovality and straightness. [2, 6]
Aikerly would select manufacturing partners against these requirements, align the tube, guide and collar drawings, and agree inspection responsibilities before ordering samples. Our immediate deliverables would be the prototype drawings, a process plan and inspection requirements for representative finished parts.
Assembly trials would establish sliding fit and a repeatable lock setting, followed by checks for axial retention and damage beneath the collars. Grip and tip attachments need controlled preparation and curing where adhesives are used. The aluminum alternative would require its own heat treatment, finish and isolation at carbon contact areas.
5 Batch production
Batch production would follow prototype validation and a controlled pilot run. The prototype plan would cover bending at maximum working extension, axial lock slip, collar damage and repeated loading, together with grip, strap and tip retention. Repeated adjustment in wet or contaminated conditions would test the joint arrangement under the intended use conditions.
DIN 79016:2024-07 is a relevant requirements and test-methods reference for hiking and trekking poles. Aikerly would coordinate the test scope and acceptance criteria with the client, manufacturers and testing laboratory, using the applicable procedures in the full standard. The present study establishes no tested load rating or service life. [7]
The pilot run would use the intended materials, tooling and assembly methods. Its purpose is to measure dimensional variation, finished weight, lock consistency and rework, and to check interchangeability between tubes and guides. Any need for individual part matching would be recorded as an assembly and replacement-part constraint.
Aikerly would bring the pilot measurements, test reports and agreed changes into a production package covering drawings, the bill of materials, process requirements and inspection criteria. Manufacturing partners would retain the material and process records for their operations; we would coordinate traceability and the agreed checks across the assembled product. Changes to materials, laminate, tube walls or locks would be reviewed against the validated design.
The commercial review would compare tooling, order quantity, tube yield, inspection, assembly and packaging costs. Pilot results would inform the production quotation and delivery plan. Minimum order quantity, lead time and the finished-weight limit would be agreed with the selected manufacturers once the design and process requirements are established.
Calculation basis and references
Calculated dimensions and masses assume circular, uniform tube sections. They exclude local reinforcement, finishes and attached components. The assessment combines nominal calculations with published material and process information; specimen tests and structural simulation remain part of subsequent development.
[1] Toray Composite Materials America. TORAYCA T700S and T800S fiber data sheets. Additional data
[2] TIMET. TIMETAL 3-2.5 material data
[3] TIMET. TIMETAL 6-4 material data
[4] Black Diamond. Trail Trekking Poles product information
[5] Rock West Composites. Roll wrapped carbon fiber tubes and composite tube design guidance. Additional data
[6] Haynes International. Ti-3Al-2.5V tubing and delivery conditions
[7] DIN Media. DIN 79016 2024 07 standard catalogue entry
Send the intended use, length range, target weight, cost expectations and production quantity, together with any available drawings. Aikerly can review the material and process options and define the information, samples and inspection requirements needed for the next development stage.
To purchase carbon fiber and titanium trekking poles, please visit